Quality and trust
Evidence you can check, not a black box
Inspection decisions affect safety, recalls and compliance. Viseena records how every model was built and every verdict was made, so your quality team can verify the system rather than trust it.
Evidence
- Verdict lineage
- Model, data, approver
- Retraining
- Needs approval
- Certifications
- None yet
- Penetration test
- Planned
- ISO/IEC 27001
- Planned
How we build for quality teams
- 01
Accuracy on real parts
Synthetic training is only judged by results on your real frames, reported per defect class.
Measured - 02
Every verdict has a lineage
Each decision links to the model version, its training data and who approved it.
Traceable - 03
People approve changes
No retrained model reaches a live station without an engineer's approval.
Controlled - 04
Uncertain means review
Frames the model is unsure about go to a person, not to a guess.
Conservative - 05
Clear limits
We say which defects and conditions a model has not been validated for.
Honest - 06
Your data stays yours
Images, datasets and adapters belong to you and are not shared without consent.
Yours
How a model earns a live station
Evaluate
Per-class accuracy on a held-out set of real frames.
Shadow
Run beside current inspection and review every disagreement.
Approve
An engineer signs off thresholds and actions.
Monitor
Drift and review-rate alerts after go-live.
Where Viseena fits in your quality system
Viseena supports the evidence work these standards ask for. It is not a certification body and does not certify your process.
| Standard or rule | What it covers | How Viseena can support it |
|---|---|---|
| ISO 9001 | Quality management systems | Records of inspection decisions, model changes and approvals |
| IATF 16949 | Automotive quality management | Traceability per part and evidence for measurement system analysis |
| FDA 21 CFR Part 11 | Electronic records and signatures (US) | Audit trail and approval records to support Part 11 work (e-signatures planned) |
| EU GMP Annex 11 | Computerised systems in pharma | Validation evidence and change control records |
| IEC 62443 | Industrial automation security | Edge node hardening and network design aligned to the series (assessment planned) |
| ISO/IEC 27001 | Information security management | Certification programme planned before general availability |
Every verdict, explained after the fact
When a customer complaint or audit asks why a part passed or failed, the record shows the frame, the model, the data it was trained on and who approved it.
- Frame, mask and verdict per part
- Model and dataset lineage
- Exports for your QMS
Part 004 812, rejected
- Time
- 14:22:07.481
- Station
- Line A · ST-2
- Verdict
- Reject
- Class
- Scratch, 0.97
- Model
- AX-204 adapter v7
- Dataset
- Synvex run 18 + real set 3
- Approved by
- Engineer, 2027-03-02
Security on the plant floor
- 01
Local processing
Frames are processed on the edge node and stay there unless you opt in.
Edge - 02
Outbound only
Edge nodes never accept inbound connections from the internet.
Network - 03
In transit and at rest
TLS for every connection; encrypted storage for datasets and models.
Encryption - 04
Least privilege
Separate roles for operators, engineers and administrators.
Access - 05
Independent tests
A third-party penetration test is planned before general availability.
Testing - 06
Report an issue
Email security@viseena.com to report a vulnerability.
Disclosure
About quality and trust
Is Viseena certified?
No. Viseena is pre-launch and holds no certifications. We support the evidence your own certifications require, and we will list any certification only once it is granted.
Can a synthetic-trained model be validated?
Yes, in the same way as any inspection method: against real parts with known status. That is why every pilot measures accuracy on your real frames.
What happens when the model is wrong?
Every disagreement found in review is logged, fed back into training, and visible in the audit trail.
Review our approach with your quality team
We will walk through the validation method and audit trail with your quality and IT leads.